The five links of the results chain, the output–outcome distinction, and how to read a logframe.
A results chain is the causal logic of a project, in five links:
An output is what you delivered. An outcome is what changed. "200 farmers trained" is an output. "200 farmers now planting on time and spacing correctly" is an outcome. A borehole drilled is an output; a community drinking safe water is the outcome. Projects that confuse the two end up reporting activity instead of change.
Read from the bottom upward, the way the project logic actually flows. The targets and figures here are illustrative.
| Level | Narrative summary | Example indicator | Means of verification | Key assumptions |
|---|---|---|---|---|
| Impact / Goal | Improved food security and incomes for farming households in the district | Change in average maize yield and household income from baseline to endline | Baseline and endline household survey; district and Ghana Statistical Service data | Rains adequate; market prices stable |
| Outcome | Trained farmers adopt climate-smart practices | Share of trained farmers using correct spacing, timely planting and recommended fertiliser by endline (illustrative target: 70%) | Endline survey; demonstration plot records; KoboToolbox monitoring | Farmers can access the improved seed; they judge the method worth the effort |
| Outputs | Farmers trained; demonstration plots established; improved seed distributed | 200 farmers trained; 10 demonstration plots established; seed delivered to 200 farmers | Training attendance sheets; field officer KoboToolbox records | Seed and materials arrive before planting |
| Activities | Deliver the training; set up the demonstration plots; distribute the seed | Activities completed on schedule and on budget | Work plans; monthly activity reports | Trainers and transport available; communities accessible and settled |
How to read it: the bottom row is the day-to-day work, and each row above it is the result that work should produce. The indicator column tells you what to measure at each level, the means of verification tells you where the evidence comes from, and the assumptions column names what must hold true for one level to lead to the next. When an evaluation later asks why a project did or did not work, the answer is very often hiding in a broken assumption.